NPSI Standards Guide 03
Series: Regulatory & Testing History
At a Glance
- Governing document: UFC 4-022-02, Selection and Application of Vehicle Barriers (issued 2007, amended by Change 1) — part of the DOD Unified Facilities Criteria.
- Companions: UFC 4-010-01 (minimum antiterrorism standards), UFC 4-010-02 (standoff distances, FOUO), UFC 4-022-01 (entry control facilities).
- Method: define the design basis threat vehicle → compute achievable impact speed from site geometry → select a barrier whose tested rating meets the resulting kinetic energy at the required standoff.
- Key idea: standoff distance is a countermeasure. Distance from the blast is the cheapest protection a site can buy.
The UFC system in one paragraph
The Unified Facilities Criteria are the DOD's common design rulebook, applicable across
the Army, Navy, and Air Force. For perimeter security the load-bearing documents are
UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, which establishes
when standoff and perimeter measures are required, and UFC 4-022-02,
Selection and Application of Vehicle Barriers, which governs how the barriers
themselves are chosen, rated, and applied at entry control facilities and along
perimeters.
Threat-driven, not catalog-driven
The UFC method inverts how commercial projects often buy barriers. It starts from a
design basis threat: a vehicle class and weight the installation must
defeat, set through the installation's antiterrorism planning. From there:
- Achievable speed: the real approach geometry — road alignment, turns,
grades, traffic calming — determines the maximum speed that threat vehicle can actually
reach at the barrier line. A K12-class barrier on an approach where 25 mph is physically
unattainable is money spent on the wrong problem.
- Kinetic energy: vehicle mass and achievable speed give the impact
energy the barrier must absorb. Tested crash ratings (ASTM F2656 designations) are then
matched to that requirement.
- Penetration and standoff: the barrier's tested penetration is
subtracted from the geometry. If the protected asset needs 25 m of standoff and the
barrier is rated P2 (up to 7 m), the barrier line moves outward accordingly.
Standoff: the quiet half of the design
UFC 4-010-01 ties required standoff distances to explosive threat weights and building
construction. The vehicle barrier exists to guarantee that distance — it is not an end in
itself. This is why penetration ratings dominate DOD work: a barrier that arrests the truck
chassis but lets the cargo bed reach 20 m closer has silently consumed 20 m of the standoff
the blast engineers assumed. The specific standoff tables are distribution-restricted
(UFC 4-010-02), but the design logic is public and applies to any high-consequence
facility, federal or not.
Active barriers and entry control
At entry control facilities, UFC 4-022-01 and 4-022-02 together govern the interplay of
active barriers (wedges, retractable bollards, drop-arms), the response zone, and
safety — including the recognition that an active barrier deploying under a civilian
vehicle is itself a hazard requiring signals, timing, and interlocks. Cycle rate,
emergency-fast operation, and fail-secure vs. fail-safe behavior are specification items
with the same weight as the crash rating.
What the specifier should take from the UFC method
- Establish the threat vehicle and achievable speed before naming a rating. The site's
geometry may buy down the requirement — or forbid shortcuts.
- Specify the penetration rating as a standoff component, not a footnote.
- On DOD work, cite the UFC editions in force for the project and defer to the
installation's antiterrorism officer for the design basis threat.
- On non-DOD work, the method still holds: threat, speed, energy, penetration,
standoff — in that order.
Sources & Further Reading
- DOD, UFC 4-022-02, Selection and Application of Vehicle Barriers, with Change 1 — available via the Whole Building Design Guide (wbdg.org).
- DOD, UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.
- DOD, UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points (2005).
- DOD, Anti-Ram Vehicle Barriers List (periodically updated) — barriers with accepted crash test results for DOD use.